PU Sports flooring

*Technical specifications and implementation steps*

 After the installation of the site cement or asphalt suitable and approved.

We use the Multi-layer Sys PU system using a multi-layer shock absorber polyurethane system that is installed without any separators on the site we use the Multi-layer Sys PU system using a multi-layer shock absorber polyurethane system that is installed without any separators on the site

All materials used are non-pre-fabricated and are mixed in site

The First Layer

Primer Prefabrication Primer paint is applied over asphalt or cement to ensure optimal rubber stability and pre-priming.

The second layer

Binder (SBR + Polyurethane Binder) A base (6mm thickness) for the running track made of black rubber granules (SBR) and mixed with a special polyurethane binder material, mixed and poured on site, It gives flexibility during running

The third layer

Filler for Rubber Layer is made of a specialized type of liquid polyurethane (a very fine rubber powder is placed when needed). This layer is designed for sports stadiums and has a special feature for the spaces after the layer of the binder. And the subsequent layer configuration.

The fourth layer

PU Sports Surface Sealer (PU Sports Surface Sealer) is made up of two types of specialized polyurethane for sports stadiums. It is characterized by softness and elongation, full closure on the lower layers (can be repeated for several days as needed), and sanding for the entire stadium.

The fifth layer

PU Sports Surface - Coating PU Sports Surface - Coating consists of two types of polyurethane, sports-free, solvent-free and self-leveling.

The sixth layer

PU Line Marking Paints - Colors (Floor paint) - Not yellowing with time - Paint is available at the site - After determining the geometry to be used (basketball court, tennis, plane etc) ...)

Stainless steel rubber pitch seal, aesthetic shape of the site (on request, cost not included in price) Materials used weather resistant (U.V.R).